The output assembly from two angles. There is an upward tilt in the line coming through the wall and thus a fixed 90 pvc replacement will not work.
This is Rev 1 sketch of the drain system realized in PVC pipe.
Existing Water Sourcing Circuits
Roll Off Dumpster fees – Elk Run
- 10 yard – 220
- 20 year 280
- 10 dollars per day rental after 2 weeks
0 Comments